Zarrin Sepahan Company was established in 1984 for the production of sand and gravel. Having been engaged in the same business, the founders aimed at offering the best quality stone materials with no formal registration. Regarding Iran’s special circumstances and need for activity and fruitfulness in the construction of our Islamic native land, our management’s spirit was not satisfied with our field of function in the process of performance, Enjoying sufficient expertise and experience in road making and asphalt work, recognition of relevant value and belief in the fact that our social, economic vital arteries are our high ways, we further aimed at road construction, and in 1989, our company commenced its cooperation with Esfahan Province General Administration of Roads & Transportation.

  • 95% of asphalt is stone materials & only 5% is bitumen. The stone materials are thus a significant factor and exacts the highest efforts for the selection of the best stone materials as per international standards in Iran, ie, ASTM & AASHTO.
  • Company uses mountain stone materials as per technical codes documented by technical/ soil mechanics tests, asphalt production equipment complying with the world’s state-of-the-art technology, maximum care and supervision of asphalt production, advanced distribution machineries & professional man forces. As affirmed by competent authorities, the asphalts of Company have gained rank 1 in quality.
  • Beside performing provincial projects since 1991, we started to enter into contracts with Ministry of Roads & Transportation.

A. Esfahan Province

  1. Esfahan –Steel Mill highway asphalt coating: 60 km, 1997-1999
  2. Esfahan-Steel Mill highway cold asphalt coating: 43 km, 2004-2005
  3. Zarrinshahr-Rokh gorge main road asphalt coating: 60 km, 1999
  4. Moallem highway asphalt coating and optimizing: 52 km, 2003
  5. Esfahan-Kashan 5 highways asphalt performance: 40 km, 2001-2002
  6. Fouladshahr-Najafabad asphalt layers and sublayers performance: 32 km, 1999-2001
  7. Fouladshahr-Najafabad asphalt layers and sublayers performance of beltways:31km, 2001_2002
  8. Moallem highway asphalt 2nd performance: 32 km, 2000-2001
  9. Azadegan axis asphalt coating and optimizing: 28 km, 2003-2004
  10. Khour & Biabanak main road asphalt & optimizing: 340 km,2004-2007
  11. Esfahan Province rural roads asphalt: 215 km, 2006-2008

B.  Markazi Province:

  1. Optimizing, reconstructing & coating of parts of Salafchegan- Arak Axis: 40 km, 2001-2003
  2. Arak- Khomein Highway asphalt & substructure performance: 15 km, 2005
  3. Rahjerd-Ashtian road asphalt & substructure performance: 17 km, 2005
  4. Arak-Malayer axis asphalt & optimization + bridge making + shoulder Making : 88 km, 2005-2007
  5. Arak North by-pass road making including performance of substructure, asphalt & safety sings & equipment: 28 km, 2006-2008

C. Semnan Province

  1. Establishment & reconstruction of Garmsar-Semnan 4-line axis: 20 km, end of 2006 in the process of being completed:
  2. Establishment of the new route including earth work, bridge making, surface work (substructure , base structure & asphalt) + preparation & fixation of safety signs & equipment: 36 km
  3. Route reconstruction including shoulder making, completion of technical buildings + asphalt + fixation of signs & boards : 164 km

D.  Tehran Province

  • Road making of Ghom-Garmsar main roads 3 & 4 including earth work, bridge making, performance of subbase, base & asphalt: 60 km. It started in Feb.2009 and is in the process of being performed.
  • The above mentioned performances with the establishment & mobilization of numerous workshops which will be mentioned were fulfilled using all the required machineries and equipment:

1.Zarrinshahr workshop in Esfahan Lenjan, using a mountain stone- mine which is active

2.Jandagh workshop in Jandagh-Khour-Tabas 3-way axis amidst Iran central Desert, using a mountain stone mine which is active. Our establishments here in Khour & Biabanak are unique.

3.Shahinshar workshop, 35 km on Esfahan-Tehran axis, using a mountain stone mine. In case of a project nearby, we are shortly ready to start.

4.Karchan workshop 25 km on Arak-Salafchegan axis, using a mountain stone mine. Our projects were finished in Markazi Province. We thus closed the workshop.

5.Semnan workshop, 50 km on Garmsar-Semnan axis, using a mountain stone mine, equipped with the most advanced asphalt factory, by-establishments & other machineries, complying with the latest technologies in road making & asphalt.

6.Varamin workshop 35 km on Garmsar-Ghom axis, with the production of mountain stone materials required for asphalt production & other road making materials.

By updating of our employees know-How, employing advanced machineries complying with the world’s latest state-of the –art technology, considering modern know-How in road making and putting into operation of projects in the least possible time, our company is still trying to take, though little actions, to flourish our native home. Covering the longest ways entails the very initial steps. WE ARE AWARE OF THIS!

Road construction machinery

  • Mechanical excavator         15 set
  • Bulldozer                             8 set
  • Loader                                16 set
  • Grader                                7 set
  • Rollers                                38 set
  • Trucks                                 78 set
  • Crane                                  5 set

Machines for spreading and milling all kinds of asphalt

  • Asphalt finisher                        6 set
  • Asphalt cutting machine         7 set
  • Mechanical sweeper                3 set
  • Bitumen distribution truck     2 set

Machines for the production of basis material, asphalt and concrete

  • Drilling machine              4 set
  • Air compressor                20 set
  • Diesel generator              11 set
  • Bitumen storage tank       40 set
  • Fuel storage tank              35 set

Asphalt factory, related machinery and Sand Supply Machines

  • Asphalt factory                                         7 set
  • Micro surfacing asphalt machinery        1 set
  • Sand Production Machines                     6 set

Automobile

  • Van                      22set
  • SUV                     25 set
  • Minibus               2 set

Workshop equipment

  • Buildings                                                     8,000 sqm
  • Niches and repair shops                            5,000 sqm
  • Concrete manufacturing equipment        3 set
  • Cement storage silo                                    4 set

Certificates